SAV PKT Share |
Background Vehicles
|
# Background-Vehicle (Private Car) Trips |
Background Vehicles’ Total Travel Time (hr) |
Background-Vehicles’ VOTT Costs ($) |
Parking Cost for Background Vehicles ($) |
Ownership & Use Cost of Background Vehicles ($) |
Background Vehicles’ Total Travel Costs($) |
0% |
2,500 car trips |
353 hr |
$5,095 |
$7,500 |
$5,800 |
$18,395 |
5% |
2,375 |
337 |
4,854 |
7,125 |
5,510 |
17,489 |
10% |
2,250 |
319 |
4,602 |
6,750 |
5,220 |
16,572 |
20% |
2,000 |
285 |
4,104 |
6,000 |
4,640 |
14,744 |
50% |
1,250 |
178 |
2,571 |
3,750 |
2,900 |
9,221 |
100% |
- |
- |
- |
- |
- |
- |
SAV PKT Share |
SAV Riders
|
SAV
|
# SAV Riders |
SAV Rider Onboard Travel-Time Cost ($) |
SAV Rider Wait Time Costs ($) |
Average SAV User Wait Time (minutes) |
Total Cost for SAV Users ($) |
# SAVs Needed |
SAV Use Total Cost ($) |
0% |
- |
- |
- |
- |
- |
0 SAVs |
- |
5% |
600 riders |
$245 |
$1,272 |
4.2 min |
$1,517 |
27 |
$119 |
10% |
1,200 |
497 |
1,583 |
2.6 |
2,080 |
51 |
224 |
20% |
2,400 |
977 |
2,380 |
2.0 |
3,357 |
106 |
466 |
50% |
6,000 |
2,284 |
4,721 |
1.6 |
7,005 |
270 |
1,188 |
100% |
12,000 |
4,221 |
8,634 |
1.4 |
12,854 |
520 |
2,288 |
SAV PKT Share |
Total Cost for All Travel in Corridor ($) |
Total Cost per PKT in Corridor ($) |
SAV Average Vehicle Occupancy (AVO) |
SAV AVO in Center 2-mile Section of Corridor |
0% |
$18,395 |
$0.95 per PKT in corridor |
0 |
0 |
5% |
19,125 |
0.99 |
56% |
71% |
10% |
18,876 |
0.98 |
59% |
75% |
20% |
18,568 |
0.96 |
57% |
74% |
50% |
17,414 |
0.90 |
56% |
66% |
100% |
15,142 |
0.78 |
58% |
62% |