Capacity (# of seats) |
10 seats |
4 seats |
[b@89560] |
Vehicle dimension |
Length (m) |
5.5 m |
4.3 |
[b@89554; @89549] |
Width (m) |
2.5 m |
1.8 |
Height (m) |
2.8 m |
1.5 |
Lane changing model |
LC2013 |
[b@89545] |
Car following model |
MinGap (m) |
1 m |
2.5 |
[b@89559] |
Acceleration rate (m/s2) |
1.28 m/s2 |
2.6 |
[b@89542] |
Deceleration rate (m/s2) |
1.63 m/s2 |
4.5 |
Emergency deceleration rate (m/s2) |
9 |
[b@89554] |
Other parameters (e.g., driver imperfection) |
Krauss |
[b@89555] |
Boarding duration (second per rider) |
4 seconds |
N/A |
[b@89553] |